AGRICULTURE AND IRRIGATION
|
 |
IRRIGATION
It is the perennial source of irrigation that helps the land to be green throughout the year, and provides with an assured remedy to relieve the tillage from the random rains that still determine the agrarian pattern of the district. There is still an imbalance between the ' dry' and ' wet' crops which are found everywhere side by side in the district. The efforts to increase the irrigational facilities so as to bring more land under 'wet' crops in the district, however are restricted to a very limited area as could be seen from the proportion of gross irrigated area to gross cropped area in the year 1959-60 which was 4.89 per cent as against the State average of 6.23 per cent.
The chief source of irrigation in the district are the wells. Canals 'have also been made and are supplied with water either from artificial tanks or from risers that have been dammed up. The fields are watered either by lift or by flow from canals and water courses. Such canals numbered 112 in 1961-62. out of which 96 were government canals and the remaining 16 were owned by non-governmental bodies. They together irrigated an area of 9947.182 hectares (24,580 acres) in 1961-62. Dhulia. Sakri, Nandurbar and Shahada talukas together have more than 90 per cent of the area irrigated by canals in the district. Private canals are mainly found in Shahada taluka. The irrigation wells numbered 13024 in 1961-62, and they irrigated in area Of 18902.074 hectares (46,708 acres). Wells provide the main source of irrigation in all the nine talukas of the district. Akkalkuwa, Taloda, and Shirpur talukas have their lands irrigated entirely by wells, while Akrani Taluka has practically no area under irrigation.
The wells are usually of two kinds pakka or masonry wells and kachcha or unfaced wells. They are worked by mot which is in almost universal use. The mot,
a large leathern bucket, is so suspended as to discharge itself on rising to the surface. The motive power is supplied by a pair of bullocks advancing and retreating on an inclined plane.
The net irrigated area [These figures include areas irrigated by canals, wells and tanks.] increased from 27166.976 hectares (67,131 acre) in 1952-53 to 29741 993 hectares (73,494 acres) in 1961-62 or by 9.5 per cent in the course of ten years.
'Another remarkable improvement has been in the number of oil engines and electric pumps used for irrigation. The number of electric pumps increased from 13 in 1951 to 81 in 1961. The number of oil engines increased from 844 in 1951 to 3826 in 1961.[Census of India 1961, District Census Handbook, Dhulia, p. 3.]
Other details regarding the sources of irrigation such as their location, area irrigated by them, water rates charged, the crops irrigated and their constructional description are given in the
following tables. The table No. 35 gives information about the irrigation works completed before the First Five-Year Plan, and those which have been completed during the first three Five Year Plans, while the table Nos. 36 and 37 give information about the irrigation works which are in progress under the control of the Zilla Parishad, and the Panchayat Samitis, respectively.
Food crops occupy about 90 per cent of the gross irrigated aiea. Of these wheat is an important irrigated crop. Other irrigated crops are rice, jowar, pulses, vegetables and chillis. Area under irrigated cotton has been gradually increasing. In Dhulia taluka more than half the irrigated area is under wheat. Another remarkable change in the cropping pattern under irrigation in the taluka is that the whole cotton producing area is under irrigation. Nandurbar taluka has the largest irrigated area under chillis. In Sakri taluka the area under irrigation is fairly well distributed among the different crops. In Taloda, Shahada and Sindkheda talukas the irrigated areas are somewhat equally distributed between wheat and chillis. The Dhulia, Shahada and Sakri talukas have got more irrigated areas" under non-food crops.
TABLE No. 35
IRRIGATION WORKS COMPLETED BEFORE AND DURING
THE FIVE-YEAR PLANS IN DHULIA DISTRICT
Sr. No. |
Name of work |
Location of work |
Taluka or Talukas served |
Period and cost 0f construction |
1 |
2 |
3 |
4 |
5 |
Bandharas on Panzra River |
Works completed before the First Five Year Plan |
1 |
Warsha Bandhara |
Warsha |
Sakri |
Not available |
2 |
Pankheda Upper Bandhara |
Pankheda |
Do. |
Do |
3 |
Pankheda Lower Bandhara |
Do. |
Do. |
Do. |
4 |
Pimpalner Nadipur Bandhara |
Pimpalner |
Do. |
Do. |
5 |
Shenpur Bandhara |
Shenpur |
Do. |
Do. |
6 |
Dhadne Bandhara |
Dhadne |
Do. |
Do. |
7 |
Pimpalner Panthal Bandhara |
Pimpalner |
Do. |
Do. |
8 |
Pimpalner Bor Kund Bandhara |
Do. |
Do. |
Do. |
9 |
Kasara Bandhara |
Kasara |
Do. | Do. |
10 |
Sayana Bandhara |
Sayana |
Do. |
DO. |
11 |
Malpur Bandhara |
Malpur |
Do. |
Do. |
12 |
Gondur Bandhara |
Gondur |
Do. |
Do. |
13 |
Nandvan Bandhara |
Nandwan |
Do |
Do. |
14 |
Samoda Bandhara |
samoda |
Do. |
DO. |
15 |
Dotarthi Bandhara |
Dotarthi |
Do. |
Do. |
16 |
Bhadne Bandhara |
Bhahadne |
Do. |
Do. |
17 |
Ner Upper Bandhara |
Ner |
Dhulia |
Do. |
18 |
Ner Lower Bandhara |
Do. |
Do. |
DO. |
19 |
Kusumba Upper Bandhara |
Kusumba |
Do. |
Do. |
20 |
Kusumba Lower Bandhara |
Do. |
Do. |
Do. |
21 |
Kheda Bandhara |
Kheda |
Do. |
Do. |
22 |
War Bandhara |
War |
Do. |
Do. |
23 |
Mukti Tank (L. P. R. Works) Dhulia |
Do. (Sindkheda, Amalner) |
Do. |
24 |
Dhulia Bandhara |
Dhulia town |
Dhulia |
Do. |
25 |
Nimkhedi Bandhara |
Nimkhedi |
Do. |
Do. |
26 |
Nyahalod Bandhara |
Nyahalod |
DO. |
Do. |
27 |
Japi Bandhara |
Japi |
DO. |
Do. |
28 |
Mohadi Bandhara |
Mohadi |
Do. |
Do. |
29 |
Mandal Bandhara |
Mandal |
Do. |
Do. |
30 |
Walkheda Bandhara |
Walkheda |
Sindkheda |
Do. |
31 |
Betawad Bandhara |
Betawad |
Do. |
Do. |
32 |
Shanimandal Tank |
Talwade |
Nandurbar |
Do. |
33 |
Peer tank |
Nandurbar town |
Do. |
DO. |
34 |
Sutara Bandhara |
Sakri Sutara |
Sakri |
Do. |
35 |
Dhaner Bandhara. |
Dhaner |
Do. |
Do. |
*Figures in brackets indicate area in acres.
TABLE No. 35—contd.
Area Commanded (in hectares)* |
Approximate Area Irrigated in 1963-64. (in hectares)* |
Description of each dam. canal, weir. tank, bandhara etc. |
Water rates charged |
Crops irrigated. |
6 |
7 |
8 |
9 |
10 |
Works completed before the First Five Year Plan |
Not available. |
21.044 |
Kaccha Bandhara | Not available. | -- |
(52) |
| | |
Do. |
104.004 |
Stone masonry bandhara |
1) For kayambagayat the water rates are charged
by the revenue department. |
Sugarcane. Plantain. wheat, gram,
dadar cotton, groundnut vegetables, fruit trees, etc. |
(257) |
Do. |
65.559 |
Do. |
(162) |
Do. |
57.870 |
Do. |
(143) |
Do. |
139.617 |
Do. |
2) For temporary bagait the water rates are charged as follows:—
Sugarcane & Plantain Rs. 120 per acre per annum
Other perennial Rs. 70 per acre per annum
Two seasons
Rs. 15 per acre.
Kharif crops
Rs. 6 per acre. |
|
(345) |
Do. |
114.931 |
Do. |
(284) |
Do. |
96.720 |
Do. |
(239) |
Do. |
161.874 |
Do. |
(400) |
Do. |
142.854 |
Do. |
(353) |
Do. |
8.498 |
Do. |
(21) |
Do. |
91.459 |
Do. |
|
|
(226) |
Do. |
159.851 |
Do. |
Hot seasonal crops
Rs. 18 per acre.
One watering to Kharif crop
Rs.3 per acre. |
|
(395) |
|
Do. |
68.797 |
Do. |
(170) |
|
Do. |
167.540 |
Do. |
|
|
(414) |
Do. |
11.331 |
Do. |
One watering to rabi
crop |
|
(28) |
Do. |
180.085 |
Do. |
Rs. 4 per acre. |
|
(445) |
Do. |
77.700 |
Do. |
Groundnut
double the bhusar rate per acre. |
|
(192) |
Do. |
106.028 |
Do. |
Cotton Crop
Rs. 37 per acre for 1964-65 & 1965-66 only. |
|
(262) |
Do. |
198.296 |
Do. |
(490) |
Do. |
198.296 |
Do. |
| |
(490) |
Do. |
178.871 |
Do. |
| |
(442) |
Do. |
173. 205 |
Do. |
| |
(428) |
Do. |
|
Earthen dam |
Not known |
161.874 |
Stone masonry Bandhara. |
| |
(400) |
Do. |
77.295 |
Do. |
| |
(191) |
Do. |
323.749 |
Do. |
| |
(800) |
Do. |
164.707 |
Do. |
| |
(407) |
Do. |
135.165 |
Do. |
| |
(334) |
Do. |
196.677 |
Do. |
| |
(486) |
Do. |
162.684 |
Kaccha bandhara and channel stone. masonry bandhara earthen dam. |
| |
(402) |
Do. |
171.991 |
| |
(425) |
Do. |
Not available. |
Stone masonry bandhara. | | |
Do. |
Do. |
| | |
Not available |
Not available |
Not available |
Not available |
Not available |
Do. |
Do. |
Do. |
Do. |
|
*Figures in brackets indicate area in acres.
TABLE
No. 35-contd.
1 |
2 |
3 |
4 |
5 |
36 |
Machamal Bandhara |
Machamal |
Sakri |
Not available |
37 |
Khandbara Bandhara |
Khandbara |
Do. |
Do. |
38 |
Dahivel Bandhara |
Dahivel |
Do. |
Do. |
39 |
Bhadgaon Bandhara |
Bhadgaon |
Do. |
Do. |
40 |
Kirwade Bandhara |
Kirwade |
Do. |
Do. |
41 |
Surpan Bandhara |
Surpan |
Do. |
Do. |
42 |
Astane Bandhara |
Astane |
Do. |
Do. |
43 |
Jirethal Bandhara |
Jirethal |
Do. |
Do. |
44 |
Bhandane Bandhara |
Bhandane |
Do. |
Do. |
|
Bandharias on the tributaries of Panzra river. |
45 |
Kudashi Bandhara |
Kudashi |
Do. |
Do. |
46 |
Dangshirwada Bandhara |
Dangshirwada |
Do. |
Do. |
47 |
Virkhel Upper Bandhara |
Virkhel |
Do. |
Do. |
48 |
Virkhel Lower Bandhara |
Virkhel |
Do. |
Do. |
49 |
Balnane Bandhara |
Balnane |
Do. |
Do. |
50 |
Deshirwade Bandhara |
Deshirwade |
Do. |
Do. |
51 |
Chiksa Bandhara |
Chiksa |
Do. |
Do. |
52 |
Morane Bandhara |
Morane |
Do. |
Do. |
53 |
Jirapur Bandhara |
Jirapur |
Do. |
Do. |
54 |
Gondur Tank |
Gondur |
Dhulia |
Do. |
Works completed during
the first five year plan. |
55 |
Bandhara at Kolde |
7 miles away from Nan-durbar. |
Nandurbar |
Not available |
56 |
Bandhara at Girasgaon |
Girasgaon |
Do. |
Do. |
57 |
Bandhara at Dhamdod. |
Dhamdod |
Do. |
Do. |
58 |
Bandhara at Devale |
Devale |
Do. |
Do. |
54 |
Bandhara at Dhulawad |
On River Shivan |
Do. |
Year 1963-
Rs.0.49 lakhs |
60 |
Bandhara at Navitanda. |
Navitanda |
Do. |
Year 1953 -
Rs. 0.80 lakhs. |
61 |
Bandhara at Bhone |
On river Patalganga near Bhone. |
Do. |
Very old. |
62 |
Bandhara at Adchi |
Adchi. |
Do. |
Year 1953-
Rs.0.19 lakhs Dhulia |
63 |
Bandhara at Dudhala |
Dudhala |
Do. |
Year 1953-
Rs.0.17 lakhs. |
64 |
Bandhara at Kothali |
On Goon Nalla near Kothali. |
Do. |
Year 1953-
Rs.O.19 lakhs. |
65 |
Bandhara at Gujar Bhawali |
On River Shivan near Gujar Bhawali. |
Do. |
Year 1953-
Rs.0.13 lakhs. |
66 |
Renovation to Bandhara at Sunderde. |
Sunderde |
Do. |
Very old.
Rs.0.29 lakhs. |
67 |
Bandhara at Nimdhahi |
Nimdhani |
Do. |
-- |
68 |
Bandhara at Devi |
Devi |
Sindkheda |
Very old. |
69 |
Bandhara at Hol |
Hol |
Shahada |
Do. |
70 |
Bandhara at Chaupale |
Chaupale |
Nandurbar |
-- |
Works completed during
the Second Five-Year Plan. |
71 |
New chanael from Betawad Bandhara to Betawad Paste OR Panzra River, |
Oae mile away from Ajande Bk. |
Sindkheda |
1952-60
not known. |
72 |
B and C on River Burai near Chimathana |
3 miles away from Chimathana. |
Do. |
1952-60- cost of construction not known. |
73 |
Extension of Old Kapadne Channel on Lower Panzra River. |
Nimkhedi |
Dhulia |
1953-61-
Rs. 185950 |
TABLE
No. 35-contd.
6 |
7 |
8 |
9 |
10 |
Not available. |
Not available. |
Not available |
Not available. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Stone masonry. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Do. |
Do. |
|
Do. |
Do. |
Earthen dam |
Do. |
|
Works completed during
the first five year plan. |
Do. |
Do. |
Stone masonry bandhara. |
-- |
|
141.640 |
101.171 |
Do. |
Not assessed |
No Irrigation. |
(350) |
(250) |
Not available. |
Not available |
Do. |
-- |
|
121.406 |
97.125 |
Do. |
-- |
|
(300) |
(240) |
242.811 |
242.811 |
Do. |
Not assessed. |
No Irrigation. |
(600) |
(600) |
242.811 |
242.811 |
Do. |
Do. |
Do. |
(600) |
(600) |
121.406 |
84.984 |
Do. |
-- |
|
(300) |
(210) |
283.280 |
283.280 |
Do. |
Rs. 9 per acre for rabi crops and irrigation cess Rs. 3 per acre. |
Wheat, gram, dadar |
(700) |
(700) |
76.890 |
76.890 |
Do. |
-- |
|
(190) |
(190) |
121.406 |
121.406 |
Do. |
Not assessed |
No Irrigation. |
(300) |
(300) |
283.280 |
283.280 |
Do. |
Rs. 9 per acre for rabi crops and irrigation cess Rs. 3 per acre. |
Wheat, gram, dadar |
(700) |
(700) |
121.406 |
121.406 |
Do. |
-- |
|
(300) |
(300) |
-- |
-- |
|
Rs. 9 per acre for rabi crops and irrigation cess Rs. 3 per acre. |
Wheat, gram. |
192.226 |
101.171 |
|
|
|
(475) |
(250) |
607.029 |
323.749 |
Stone masonry |
Not assessed |
No irrigation. |
(1500) |
(800) |
-- |
-- | |
|
|
Works completed during
the first five year plan. |
404.686 |
404.686 |
Extension of canal, |
Rabi crops at Rs. 9 per acre Kharif crops at Rs. 6 per acre. |
Wheat, gram, dadar rice. |
(1000) |
(1000) |
2687.115 |
2687.115 |
Stone masonry bandhara. |
Do. |
Do. |
(6640) |
(6640) |
687.966 |
445.155 |
Extension of canal |
Do. |
Do. |
(1700) |
(1100) |
TABLE
No. 35-contd.
1 |
2 |
3 |
4 |
5 |
Works completed during
the third five year plan. |
74 |
Earthen dam at Purmepada. |
15 miles away from Dhulia. |
Dhulia |
1953-54 Rs.41.03 lakhs |
75 |
Band C at Anchade |
Anchade |
Do. |
1959-66 Rs.0.55 lakhs. |
76 |
Bandhara across Moti Nalla |
4 miles away from Dhulia. |
Do. |
1959-66 Rs. 0.66 lakhs |
77 |
Bandhara across Panzra river. |
Sayyadnagar |
Shakri |
1953-64 Rs.27.37 lakhs |
78 |
Extension of Shahada Canal. |
Kawalith |
Shahada |
1952-64 Rs. 15.65 lakhs |
79 |
Bandhara and Channel on River Susari. |
4 miles away from Shahada' |
Do. |
1952-64 Rs. 4.76 lakhs |
80 |
B. and.C.across Ajnad Nalla near Nageshwar. |
Nageshwar |
Shirpur |
1962-63 Rs.0.46 lakhs |
81 |
Bandhara and Canal at Gogapur. |
Jidhare |
Shahada |
11th September 1962 to 31stDecember 1963. Rs. 0.46 lakhs |
82 |
Bandhara at Dhong |
Gaon Nalla near Dhong. |
nawapur |
1962-63 Rs. 0.35 lakhs. |
83 |
Bandhara on Rangawali river near Umardi. |
Umardi |
Do. |
24th February 1961 to 15lh April 1962. Rs. 0.29 lakhs. |
84 |
S. R. to Bandhara at Raingaon. |
Raingaon. |
Do. |
Not known. Rs 0.14 lakhs |
85 |
Canal at Umaj |
On Gaon Nalla near Umaj. |
Nandurbar |
1961. Rs.0.19 lakhs. |
86 |
C.R.to Bandhara across river Patalganga near Bhone. |
Bhone |
Do. |
Not known. |
87 |
Improvements to Bandhara at Narayanpur. |
On river Shivan near Village Narayanpur. |
Do. |
1963-64. Rs. 0.33 lakhs. |
88 |
Bandhara at Sangwi |
Sangwi |
Shirpur |
1961-64. Rs.O.75 lakhs. (Revised). |
89 |
Bandhara at Boradi |
Shirpur, Boradi. |
Do. |
1957-62 RS 0.24 lakhs. |
90 |
Bandhara at Nagzari |
Nagzari |
Nawapur |
1961-64. Rs. 0.35 lakhs |
91 |
Improvements to Bandhara at Shewade. |
Sindkheda Shewade |
Sindkheda |
1962-64. Rs. 0.77 lakhs. |
Works in Progress Taken
up During the Third Five-Year Plan. |
92 |
Tank at Jamphal |
Songir |
Sindkheda |
20th March 1965. Rs. 11.94 lakhs. |
93 |
Tank at Kulthe |
Kulthe |
Dhulia |
15th.April 1961 Rs.7.47 lakhs. |
94 |
Tank at Chawadi |
Chawadi |
Sakri |
Not started. Rs. 10.58 lakhs. |
95 |
Remoulding Shanimandal Tank including diverting the Asarbari Nalla in the existing tank. |
Talwade |
Nandurbar |
12th March 1966. Rs.0.80 lakhs. |
96 |
Drainage Scheme between Mohida and Desai branch of Shahada canal. |
Shahada |
Shahada |
14th October 1963. Rs.2.71 lakhs. |
97 |
Bandhara and Canal at Walkheda. |
Mandal |
Sindkheda |
2nd November 196 Rs.3.28 lakhs |
98 |
Extension and improvement bandhara at Dhanrat. |
Nawapur |
Nawapur |
12th October 1963 Rs. 1.59 lakhs |
TABLE
No. 35-contd.
6 |
7 |
8 |
9 |
10 |
Works completed during
the third five year plan. |
4856.232 |
9000 |
Earthen dam |
Rabi crops at Rs. 9 per acre, Kharif crops at Rs. 12 per acre(cotton). |
Wheat, gram, dadar rice, cotton, at Rs. 37. |
(12000) |
-- |
121.406 |
80.937 |
Stone masonry bandhara. |
Not assessed. |
No irrigation. |
(300) |
(200) |
161.874 |
121.406 |
Do. |
Do. |
Do. |
(400) |
(300) |
6047. 628 |
6047.628 |
Do. |
Rabi crops at Rs. 9 peracre, Kharif crops atRs. 6 per acre. Hot weather crops Rs. 12 per acre, other perennial crops at Rs. 70 per acre. |
Do. |
(14944) |
(14944) |
|
|
1214.058 |
6591.983 |
Extension of canal |
Rabi crops at Rs. 9 per acre, Kharif crops atRs. 6 per acre. Hot weather crops Rs. 12 per acre, other perennial crops at Rs. 70 peracre. |
Do. |
(3000) |
(16215) |
For extension. |
including old canal. |
2225.733 |
2225.733 |
Stone masonry bandhara. |
Rabi Rs. 23, Kharif
Rs. 14,Hot Rs. 33. |
|
(5500) |
(5500) |
323.749 |
161.874 |
Do. |
Not assessed |
No irrigation. |
(800) |
(400) |
129.499 |
129.499 |
Do. |
Do. |
Do. |
(320) |
(320) |
182.109 |
101. 171 |
Do. |
Do. |
Do. |
(450) |
(250) |
72.843 |
52. 609 |
Do. |
Do. |
Do. |
(180) |
(130) |
-- |
242.811 |
Special repairs to existing bandhara |
Do. |
Do. |
-- |
(600) |
161.874 |
77.125 |
Excavation of canal |
Do. |
Do. |
(400) |
(240) |
-- |
-- |
Special repairs to existing bandhara. |
Do. |
Do. |
346.006 |
242.811 |
|
Rs. 9 per acre. |
Wheat, gram in rabi season. |
(955) |
(600) |
121.406 |
121.406 |
Stone masonry Bandhara. |
Not assessed |
No irrigation. |
(300) |
(300)
(Revised) |
80.937 |
60.703 |
Do. |
Do. |
Do. |
(200) |
(150) |
80.937 |
60.703 |
Do. |
Do. |
Do. |
(200) |
(150) |
121.406 |
121.406 |
Do. |
Do. |
Do. |
(300) |
(300) |
Works in Progress Taken
up During the Third Five-Year Plan. |
968.818 |
290.564 |
Earthen dam |
Do. |
Do. |
(2394) |
(718) |
424.920 |
424.920 |
Do. |
Do. |
Do. |
(1050) |
(1050) |
520.831 |
520.831 |
Do. |
Do. |
Do. |
(1287) |
(1287) |
Not known |
30.756 |
Do. |
Do. |
Do. |
-- |
(76) |
256.571 |
256.571 |
Drainage Scheme |
Do. |
Do. |
(634) |
(634) |
768.903 |
768.903 |
Stone masonry |
Do. |
Do. |
(1900) |
(1900) |
182.109 |
182.109 |
Do. |
Do. |
Do. |
(450) |
(450) |
TABLE
No. 36
BANDHARA WORKS UNDERTAKEN DURING THE THIRD
FIVE-YEAR PLAN BY THE ZILLA PARISHAD
Location of Bandhara or canal |
Taluka |
Cost of construction |
Area commanded
(in hectares) |
Area irrigated |
1 |
2 |
3 |
4 |
5 |
Akhatwada |
Nandurbar |
36.968 |
80.937 |
The works are in
progress. |
(200) |
Ranala |
Nandurbar |
45,000 |
60.703 |
Do. |
(150) |
Deojapada |
Sakri |
-- |
60.703 |
Do. |
(150) |
Budki |
Shirpur |
45,512 |
80.937 |
Do. |
(200) |
Across (he river Dehli near village Ghotpada. |
Akkalkuwa |
65,748 |
97.125 |
Do. |
(240) |
* Figures in brackets indicate area in acres.
TABLE
No. 36- contd.
BANDHARA WORKS UNDERTAKEN DURING THE THIRD
FIVE-YEAR PLAN BY THE ZILLA PARISHAD
Description of bandhara |
Water-rates charged |
Crops irrigated |
6 |
7 |
8 |
Masonry bandhara with one canal only |
Not yet decided, but the rates will be followed as per the rates of State sector. |
Kharif bandharas are not found successful in Dhulia district and hence as per Government orders, only Rabi bandharas are selected for execution. In Rabi season generally the following crops are grown:- |
Do. |
|
Do. |
|
(1) Wheat, (2) Dadar, (3) Chilli, (4) Gram. |
Do. |
|
|
Do. |
|
|
* Figures in brackets indicate area in acres.
TABLE
No. 37
BANDHARA WORKS IN PROGRESS WITH THE PANCHAYAT
SAMITIS IN DHULIA DISTRICT IN 1964-65.
Location of Bandhara or canal |
Taluka |
Cost of Construction |
Area commanded (in hectares)* |
Area irrigated (in hectares)* |
1 |
2 |
3 |
4 |
5 |
Samoda |
Sakri |
93,714 |
210.437 |
121.406 |
(520) |
(300) |
Chikse |
Do. |
35,526 |
121.406 |
80.937 |
(300) |
(200) |
Do. |
29,689 |
60.703 |
40.469 |
(150) |
(100) |
Do. |
49,702 |
161.874 |
70.820 |
(400) |
(175) |
Do. |
41,502 |
60.703 |
32.375 |
(150) |
(80) |
Do. |
20,278 |
40.469 |
28.328 |
(100) |
(70) |
Do. |
15.128 |
40.469 |
28.328 |
(100) |
(70) |
Do. |
12,410 |
28.328 |
28.328 |
(70) |
(70) |
Akkalkuwa |
22,149 |
28.328 |
4.047 |
(70) |
(10) |
Do. |
13,119 |
20.234 |
-- |
(50) |
|
Do. |
2,767 |
6.070 |
1.619 |
(15) |
(4) |
Nawapur |
33,141 |
60.703 |
The work, is in progress. |
(150) |
Chinchapada |
Nawapur |
34,811 |
101.171 |
Do. |
(250) |
Do. |
22,679 |
40.469 |
Do. |
(100) |
Do. |
30,826 |
48.562 |
Do. |
(120) |
* Figures in brackets indicate area in acres.
TABLE
No. 37 - contd.
BANDHARA WORKS IN PROGRESS WITH THE PANCHAYAT
SAMITIS IN DHULIA DISTRICT IN 1964-65.
Description of bandhara |
Water rates charged |
Crops irrigated |
6 |
7 |
8 |
Masonry bandhara with one main canal only. |
Not yet decided, but the rates will be followed as per the rates of State sector. |
Wheat. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Wheat, Nagali, Rice. |
Do. |
Do. |
Wheat. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
The bandhara works are in progress and are useful for rabi crops such as.-
(1) Wheat, (2) Dadar, (3) Chilli and (4) Gram. |
-- |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
Do. |
* Figures in brackets indicate area in acres.
TABLE No. 38
TALUKA-WISE SOURCES OF WATER-SUPPLY AND AREA IRRIGATED IN DHULIA DISTRICT, 1952-53, 1956-57 AND 1961-62
(Figures of area in hectares)
Taluka |
Year |
Government canals |
Private canals |
No. |
Mileage |
Net area irrigated |
No. |
Mileage |
Net area irrigated |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
Dhulia |
1952-53 |
13 |
35 |
4,934.336 |
1 |
4 |
-- |
(12,193) |
1956-57 |
13 |
35 |
4,337.829 |
1 |
4 |
248.82 |
(10,719) |
(615) |
1961-62 |
13 |
35 |
2,054.186 |
1 |
4 |
-- |
(5,076) |
Sindkheda |
1952-53 |
4 |
10 |
350.453 |
3 |
3 |
46.539 |
(866) |
(115) |
1956-57 |
7 |
13 |
392.141 |
3 |
4 |
157.01 |
(969) |
(3 88 |
1961-62 |
7 |
13 |
746.241 |
3 |
4 |
-- |
(1,844) |
Shirpur |
1952-53 |
-- |
-- |
-- |
-- |
-- |
-- |
1956-57 |
-- |
-- | -- |
-- |
-- |
-- |
1961-62 |
-- |
-- |
-- |
-- |
-- |
-- |
Sakri |
1952-53 |
70 |
45 |
3,018.553 |
-- |
-- |
-- -- |
(7,459) |
1956-57 |
70 |
45 |
1,099.064 |
-- |
-- |
-- |
(10,129) |
1961-62 |
70 |
45 |
4,099.064 |
-- |
-- |
-- |
(10,129) |
Nandurbar |
1952-53 |
1 |
1 |
553.206 |
2 |
2½ |
86.198 |
(1,367) |
(213) |
1956-57 |
1 |
1 |
2,114.882 |
2 |
-- |
120.192 |
(5,280) |
(297) |
1961-62 |
1 |
1 |
1.072.823 |
2 |
1 |
111.288 |
(2,651) |
(275) |
Nawapur |
1952-53 |
2 |
½ |
83.770 |
3 |
½ |
22.682 |
(207) |
(56) |
1956-57 |
2 |
½ |
131.928 |
3 |
½ |
65.964 |
(326) |
(163) |
1961-62 |
4 |
½ |
134.760 |
1 |
½ |
-- |
(333) |
Shahada |
1952-53 |
1 |
12 |
1,214.058 |
8 |
12 |
1,062.301 |
(3,000) |
(2,625) |
1956-57 |
2 |
12 |
1,447.967 |
9 |
17 |
384.45 |
(3,578) |
(950) |
1961-62 |
1 |
12 |
1,313.206 |
9 |
17 |
415.613 |
(3,245) |
(1,027) |
Taloda |
1952-53 |
-- |
-- |
-- |
-- |
-- |
-- |
1956-57 |
-- |
-- |
-- |
-- |
-- |
-- |
1961-62 |
-- |
-- |
-- |
-- |
-- |
-- |
Akkalkuwa |
1952-53 |
-- |
-- |
-- |
-- |
-- |
-- |
1956-57 |
-- |
-- |
-- |
-- |
-- |
-- |
1961-62 |
-- |
-- |
-- |
-- |
-- |
-- |
Akrani |
1952-53 |
-- |
-- |
-- |
-- |
-- |
-- |
1956-57 |
-- |
-- |
-- |
-- |
-- |
-- |
1961-62 |
-- |
-- |
-- |
-- |
-- |
-- |
* Figures in brackets are in acres.
TABLE No. 38- contd.
TALUKA-WISE SOURCES OF WATER-SUPPLY AND AREA IRRIGATED IN DHULIA DISTRICT, 1952-53, 1956-57 AND 1961-62
(Figures of area in hectares)
Irrigation wells |
Wells for domestic purposes |
Wells not in use |
Reservoirs |
Tanks |
No. of oil engines |
No. |
Net area irrigated |
No. |
Net area irrigated |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
901 |
866.837 |
383 |
-- |
5 |
-- |
88.221 |
38 |
(2.142) |
(218) |
901 |
2,799.618 |
383 |
-- |
5 |
1 |
-- |
188 |
(6,918) |
1,532 |
3,390.864 |
885 |
65 |
5 |
1 |
841.342 |
439 |
(8,379) |
(2,079) |
2,855 |
2,251.673 |
-- |
351 |
-- |
1 |
-- |
32 |
(5.564) |
2,899 |
3,981.706 |
2,081 |
353 |
142 |
-- |
-- |
181 |
(9,839) |
2,947 |
1,838.893 |
2,105 |
351 |
-- |
-- |
-- |
222 |
(4,544) |
189 |
150.138 |
-- |
-- |
-- |
-- |
-- |
12 |
(371) |
343 |
383.642 |
1,157 |
177 |
-- |
-- |
-- |
37 |
(948) |
250 |
577.892 |
100 |
-- |
-- |
-- |
-- |
75 |
(1.428) |
1,351 |
1,094.271 |
979 |
157 |
-- |
-- |
-- |
89 |
(2,704) |
1,405 |
1,862.770 |
1,008 |
135 |
-- |
-- |
-- |
157 |
(4,603) |
1,405 |
1,862.770 |
1,008 |
135 |
-- |
-- |
-- |
198 |
(4,603) |
|
-- |
3,895.912 |
689 |
297 |
-- |
31 |
80.937 |
193 |
(9,627) |
(200) |
336 |
4,527.650 |
689 |
297 |
-- |
1 |
112.907 |
386 |
(11,193) |
(279) |
3,171 |
5,108.756 |
697 |
435 |
-- |
1 |
46.539 |
501 |
(12,624) |
(115) |
198 |
149.734 |
276 |
192 |
644 |
-- |
-- |
10 |
(370) |
201 |
175.229 |
276 |
192 |
644 |
-- |
-- |
15 |
(433) |
248 |
165.516 |
276 |
192 |
644 |
-- |
-- |
86 |
(409) |
1,627 |
2,803.260 |
950 |
250 |
-- |
-- |
-- |
200 |
(6.927) |
1,873 |
3,393.497 |
1,073 |
112 |
-- |
1 |
-- |
-- |
(8,386) |
2,758 |
4,358.063 |
1,120 |
422 |
-- |
1 |
-- |
1,058 |
(11,769) |
573 |
149.734 |
1,250 |
33 |
-- |
-- |
-- |
60 |
(370) |
582 |
43.301 |
1,253 |
40 |
-- |
-- |
-- |
145 |
(107) |
613 |
1,122.194 |
850 |
47 |
-- |
-- |
-- |
315 |
(2,694) |
-- |
3,201.875 |
4 |
-- |
-- |
-- |
-- |
-- |
(6,985) |
93 |
59.893 |
525 |
23 |
-- |
-- |
-- |
-- |
(148) |
30 |
89.031 |
190 |
-- |
-- |
-- |
-- |
12 |
(220) |
11 |
628.072 |
-- |
-- |
-- |
-- |
-- |
-- |
(1,552) |
11 |
-- |
18 |
-- |
-- |
1 |
-- |
-- |
20 |
15.378 |
101 |
7 |
-- |
1 |
4.856 |
21 |
(38) |
(12) |